The warehouse complex in Essentuki, Stavropol Territory is a modern warehouse complex of ElfPlast. The total area of work amounted to 7,350 m². Given the intensive operation of the warehouse, the most important requirements for the floors were high strength, durability and resistance to loads.


High pavement durability for the operation of loading equipment
Minimal dust generation and easy to operate
Prompt execution of all works
Full complex of works on a turnkey basis
Strict compliance with building codes and standards
Efficient organization of processes to deliver the project on time
Execution of all stages of works, from design to final finishing with the use of modern solutions
Reinforcement of concrete slab in two belts with installation of embedded elements
Concreting 200 mm thick with mechanical grouting of the surface
Cutting and sealing of temperature-shrinkage joints
Grinding and polishing the concrete surface to increase strength and reduce dust generation
Laser scanning and BIM modeling of the object for digital building control


1. Preparatory work:
Laying polyethylene film for waterproofing
Protection of walls and abutment areas
Installation of reinforcement and embedded elements
Organization of concrete mortar supply
2. Installation work:
Concreting a 200 mm thick slab
Mechanical grouting of the surface
Cutting temperature-shrinkage joints
3. Finish work:
Grinding and polishing concrete
Seam sealing
Delivery and installation of materials and equipment