Work Plan for Pile Driving and Bored Piles
The PDP for pile driving is a detailed plan for pile driving operations, which includes the entire set of measures necessary for the successful and safe performance of construction tasks. The document elaborates aspects of work organization, technological processes and technical requirements, which allows to take into account all peculiarities of a particular object.
Every project created by our team is a thoughtful and professionally designed documentation that includes:
- Formalization of cover sheets signed and stamped by the project manager (ISU);
- Certificate of Conformity confirmed by "Mosstroysertification";
- Detailed work schedules and labor allocation schedules;
- Situation plan of the construction site (1:500 scale) for the period of works;
- Technological schemes for all stages of project realization;
- Slinging diagrams for lifting operations (if necessary);
Contents of the explanatory note:
- Clear instructions for piling work;
- List of mandatory requirements for quality and acceptance of performed operations;
- Occupational health and safety measures;
- Calculation of the need for construction machinery and equipment.












