PPR for the preparatory period
We develop a PDP, which is a comprehensive and structured document that includes:
- Official cover sheets with signatures and seals of the Project Manager and Chief Engineer (PE).
- Certificate of Conformity issued by "Mosstroysertification".
- A schedule of works, including timelines and milestones.
- Schedule the flow of labor, allowing for rational allocation of resources.
- A construction master plan at a scale of 1:500, up to date for the duration of the works.
- Manufacturing process flowcharts for efficient task performance.
- Slinging diagrams (if necessary) to ensure safe handling of loads.
The explanatory note includes:
- Guidelines and requirements for the performance of the work.
- Quality control measures and acceptance procedure.
- Health and Safety Instructions.
- List of required construction machinery and equipment.