Composition of executive documentation:
External breakdown network
Creation of the external network of breakdown is the first stage for sub-detail breakdown and execution survey of all elements of the object. The reference points of external networks fully duplicate the characteristics of the capital construction object (CCE), which are laid down in the design documentation. This process ensures that future building structures are exactly in line with their design provisions.
Planned grid layout
The planning grid includes lines used to regulate construction installation works (CIP) as well as the construction grid. The latter is formed by the intersecting lines of the main survey axes (MSA). The size of sides in the cells of the construction grid varies and can be, for example, 50, 100 or 200 meters, depending on the accuracy requirements of the project. The parameters are selected by specialists taking into account the specifics of the object and the accuracy stipulated in the project documentation.
Methods of construction of geodetic networks
The following methods are used to construct geodetic networks that provide high accuracy:
Triangulation
The triangulation method is based on the creation of a system of triangles for which measurements of side lengths and bases are made. The obtained data are used to accurately calculate the coordinates of reference points and determine their mutual position. This method provides a reliable basis for geodetic works.
Polygonometry
The method of polygonometry involves successive connection of selected points on the plot, forming a so-called polygonometric stroke. The starting point is usually tied to a reference point with known coordinates in advance. Then the lengths of connecting lines and angles between them are measured. The end point of the course is also referenced to the starting point, which allows you to check the accuracy of measurements and eliminate errors. The master plan and drawings show all geodetic signs, their coordinates and location.
These methods and approaches provide a reliable basis for accurate execution of construction and installation works, as well as preparation of high-quality executive documentation.