Work Plan for Scaffolding Installation
Every project created by our team is a thoughtful and professionally designed documentation that includes:
- Formalization of cover sheets signed and stamped by the project manager (ISU);
- Certificate of Conformity confirmed by "Mosstroysertification";
- Detailed work schedules and labor allocation schedules;
- Situation plan of the construction site (1:500 scale) for the period of works;
- Technological schemes for all stages of project realization;
- Slinging diagrams for lifting operations (if necessary);
Contents of the explanatory note:
- Clear instructions for piling work;
- List of mandatory requirements for quality and acceptance of performed operations;
- Occupational health and safety measures;
- Calculation of the need for construction machinery and equipment.