The Luzhniki Small Sports Arena is a universal sports facility for hockey, volleyball, basketball, gymnastics and other sports. The venue can be transformed into a 60×31 m ice arena. The grandstands can accommodate up to 8500 spectators in sports and 6700 in concert format
During the installation of the slab of the Small Ice Arena in Luzhniki, significant height deviations were identified, which required urgent surface leveling. It was necessary to eliminate the errors made during the installation as soon as possible to ensure that the site complied with the design requirements
Reliability and durability of the coating. We strive to ensure that the polished concrete is as resistant as possible to mechanical influences, as well as to wear and tear and operating conditions, to guarantee a long service life of the surface
Consistency with architectural style. Our work with polished concrete is always aimed at ensuring that the surface blends seamlessly into the overall architectural style of the building or structure
Utilizing state-of-the-art technology. We utilize advanced grinding and protection techniques for polished concrete to ensure a high quality and durable finish
Compliance with deadlines. We work in accordance with the work schedule developed together with the Customer to complete the project within the given timeframe
For this project, the customer has agreed to work with the "Grinded Concrete" technology
This method allows you to eliminate defects caused by poor quality installation and create a perfectly flat and durable surface that meets all technical requirements. The use of modern equipment and professional engineering approach ensures high accuracy and quality of work performance
Concrete grinding is especially relevant for sports facilities and concert venues, where not only functionality but also durability of the coating under intensive loads is important


1. analyzing the task and coordinating all processes
A detailed analysis of the initial site condition was carried out
Promptly agreed all stages of work with the customer, including deadlines, technical requirements and key decisions
2. Preparation for work
Organizing a team of specialists and equipment to complete the task within a tight deadline
Development of an action plan that takes into account minimizing possible delays
3. correction of defects and leveling of the site
Elimination of serious height deviations detected during initial installation
Carrying out grinding and leveling works with the use of modern equipment
4. Final processing and quality control
Final finishing of the site to achieve a perfectly flat surface
Quality control of completed works with the involvement of a team of engineers
5. Delivery of the object to the customer
Prompt completion of all works in less than three days
Joint inspection of the result with the customer, who is satisfied with the quality and timing of the execution
Key aspects: promptness, coordination at every stage, coordinated teamwork and high professionalism