Yevgeny Maximovich Primakov Gymnasium is one of the leading educational institutions in the Moscow region and the largest humanitarian cluster in Russia. The gymnasium campus includes educational, sports and cultural facilities, and is focused on the comprehensive development of students


The client entrusted us with the complete grinding, polishing and installation of the concrete surfaces. The project required an impeccable finish quality, reliable protection and aesthetic expression, so that the surfaces would meet the high standards of the gymnasium and harmonize with its architecture
Prompt and flexible execution of the full range of works
Adapting to project changes and willingness to perform additional tasks to fully meet customer requirements
Creative approach to the design and development of advanced polymer coating
Strict adherence to deadlines and high quality standards
The following technologies are agreed upon for this project:
1. grinding and polishing of concrete surfaces
Grinding of sports block stands, monolithic and other structures with dedusting and protection, ensuring clean, smooth and durable coating using "Polished Concrete" technology
2. Poured floors and screeds
Terrazzo and polymer flooring, including areas of the education building and atrium, as well as high-strength screed in the ballet hall and around the pool for stability and aesthetics
3. staircase and decorative elements
Installation of staircase geometry, polymer steps and plinths, installation of small architectural forms (MAF), giving the object completeness
4. Additional installation and finishing works
Installation of convectors, installation of plastic flooring and other flooring including screeds, and additional work throughout the school to meet design standards


1. Installation of Terrazzo poured floors
Terrazzo-type Portland cement based flooring is made
2. treatment of concrete surfaces
Grinding of grandstands, treatment of columns and atrium structures
3. Work with stairs
Geometry of polymer-coated marches
4. Polymer floors
Installation of poured and thin-layer polymer coatings, including decorative and high-strength coatings
5. Additional constructions
Manufacture of terrazzo skirting boards and installation of screeds
6. Dismantling and adjustments
Removal of wires and doorways in the Art block
7. Protection and adaptation of coatings
Covering of polymer floors and installation of convectors
8. Innovative solutions
Development of TopCoat for harsh conditions and temporary coating of a 2000 m² atrium
All phases of work were completed qualitatively within the given short deadlines. Non-standard tasks of the project and the client were solved despite the sanctions in the sphere of construction of the Russian Federation
Gallery of works




















